When boarding the ship, the PSCO immediately noticed clear grounds for a more detailed inspection of the ship’s safety standard and general condition. The PSCO found that the maintenance of especially the accommodation and the ship’s deck areas were so poor that the ship should be considered substandard.
Monthly PSC Report For February 2013
The following tables summarize some findings from the PSC inspections conducted in the main PSC MoU areas (Black Sea MoU, Mediterranean MoU, Indian Ocean MoU, Paris MoU and Tokyo MoU) during last month. Data have been also gathered from various Coast Guard agencies and are presented in each month’s report. Data from other PSC MoUs (Vina del Mar, Abuja MoU, Riyadh MoU) could not be extracted at the time this report has been issued and therefore were not included.
PSC MoUs | Black Sea | Mediterranean | Indian | Paris | Tokyo |
Total Inspections | 488 | 393 | 485 | 1421 | 2591 |
With Deficiencies | 377 | 204 | 299 | 1064 | 1725 |
Without Deficiencies | 111 | 189 | 186 | 357 | 866 |
Detentions | 14 | 31 | 24 | 65 | 117 |
Monthly PSC Report For January 2013
The following tables summarize some findings from the PSC inspections conducted in the main PSC MoU areas (Black Sea MoU, Mediterranean MoU, Indian Ocean MoU, Paris MoU and Tokyo MoU) during last month. Data have been also gathered from various Coast Guard agencies and are presented in each month’s report. Data from other PSC MoUs (Vina del Mar, Abuja MoU, Riyadh MoU) could not be extracted at the time this report has been issued and therefore were not included.
PSC MoUs | Black Sea | Mediterranean | Indian | Paris | Tokyo |
Total Inspections | 520 | 387 | 594 | 1554 | 3137 |
With Deficiencies | 399 | 218 | 364 | 1140 | 2133 |
Without Deficiencies | 121 | 169 | 230 | 414 | 1004 |
Detentions | 18 | 27 | 29 | 68 | 152 |
Monthly PSC Report For December 2012
The following tables summarize some findings from the PSC inspections conducted in the main PSC MoU areas (Black Sea MoU, Mediterranean MoU, Indian Ocean MoU, Paris MoU and Tokyo MoU) during last month. Data have been also gathered from various Coast Guard agencies and are presented in each month’s report. Data from other PSC MoUs (Vina del Mar, Abuja MoU, Riyadh MoU) could not be extracted at the time this report has been issued and therefore were not included.
PSC MoUs | Black Sea | Mediterranean | Indian | Paris | Tokyo |
Total Inspections | 509 | 456 | 436 | 1351 | 2462 |
With Deficiencies | 376 | 243 | 261 | 937 | 1608 |
Without Deficiencies | 133 | 213 | 175 | 414 | 854 |
Detentions | 21 | 27 | 16 | 53 | 80 |
Paris MoU Detention Report for General Cargo Ship MV Captain Blue
On 25 July 2007 the MV Captain Blue loaded with cement bags, sent a distress alert to JRCC (Joint Rescue and Coordination Centre) Piraeus reporting a starboard list of four degrees west of Kefalonia Island at the Ionian Sea. Following the appropriate actions from the Hellenic SAR Authorities, the ship was towed safely in the port of Kefalonia Island. The master reported to the local Coast Guard Authority that he was not in position of proceeding to ballast operations since he suspected that there could be a hole in the hold, resulting to damage on cargo. As a consequence the ship was inspected by a team of PSCOs from the PSC Office of Patra and the inspection revealed 20 deficiencies, with most of them of a serious nature resulting in a detention.
Monthly PSC Report For November 2012
The following tables summarize some general findings from the PSC inspections conducted in the main PSC MoU areas (Black Sea MoU, Mediterranean MoU, Indian Ocean MoU, Paris MoU and Tokyo MoU) during last month. Data have been also gathered from various Coast Guard agencies and are presented in each month’s report. Data from other PSC MoUs (Vina del Mar, Abuja MoU, Riyadh MoU) could not be extracted at the time this report has been issued and therefore were not included.
PSC MoUs | Black Sea | Mediterranean | Indian | Paris | Tokyo |
Total Inspections | 493 | 488 | 445 | 1446 | 3193 |
With Deficiencies | 356 | 245 | 265 | 1055 | 2133 |
Without Deficiencies | 137 | 243 | 180 | 391 | 1060 |
Detentions | 18 | 42 | 21 | 72 | 108 |
Monthly PSC Report For October 2012
The following information have been gathered mainly from PSC MoUs sites and may serve only as reference for the inspections being carried out each month by each MoU. The consistency of the information may differ between MoU since there are slight differences on the way each organization presents the inspection info. For more information on the inspections carried out please refer to each organization’s site.
Monthly PSC Report For September 2012
The following information have been gathered mainly from PSC MoUs sites and may serve only as reference for the inspections being carried out each month by each MoU. The consistency of the information may differ between MoU since there are slight differences on the way each organization presents the inspection info. For more information on the inspections carried out please refer to each organization’s site.
Monthly PSC Report For August 2012
The following information have been gathered mainly from PSC MoUs sites and may serve only as reference for the inspections being carried out each month by each MoU. The consistency of the information may differ between MoU since there are slight differences on the way each organization presents the inspection info. For more information on the inspections carried out please refer to each organization’s site.
Monthly PSC Report For July 2012
The following information have been gathered mainly from PSC MoUs sites and may serve only as reference for the inspections being carried out each month by each MoU. The consistency of the information may differ between MoU since there are slight differences on the way each organization presents the inspection info. For more information on the inspections carried out please refer to each organization’s site.