Paris MoU Detention Report for Bulk Carrier MV Sea Bridge

The ship was banned in Italy in 2002. The banning was lifted in December 2007 and the vessel was on a voyage to Port of Szczecin in Poland. After lifting the ship from banning, she was due for a Mandatory Expanded Inspection (MEI). The Mandatory Expanded PSC PMoU Inspection was carried out on 19 December 2007 on partly discharged ship in Szczecin – Poland by two of our PSC Officers. After the inspection the ship was detained having among other 27 deficiencies identified.

2013.09.19 - Paris MoU Detention Report for Bulk Carrier MV Sea Bridge Figure 1

[Read more…]