Paris MoU Detention Report for Chemical Tanker MT Gorgonilla

During a voyage of M/V Gorgonilla from Gibraltar via the Kiel Canal to Kalundborg, after passing the locks in Brunsbüttel there was a blackout and a shutdown of the main engine. The vessel went alongside in Brunsbüttel 08.02.2010. The ships crew announced the very poor technical condition of the ship and asked for help and support. On the same day an overriding PSC inspection has been carried out.

2013.12.11 - Paris MoU Detention Report for Chemical Tanker MT Gorgonilla Figure 1

[Read more…]

Paris MoU Detention Report for Bulk Carrier MV EEC Atlantic

M/V EEC Atlantic arrived at Hamburg on 27.11.2008 to discharge bulk cargo. On the same day a PSC-inspection has been carried out. The ship’s statutory certificates were expired since June 2011. The inspection revealed 43 deficiencies of which 9 were considered as ground for detention.

2013.11.13 - Paris MoU Detention Report for Bulk Carrier MV EEC Atlantic Figure 1

[Read more…]

Avoidance of Engine Room Fires

The direct cost of an engine room fire can be in the range of 1–4 million USD for a cargo vessel and much more for a passenger vessel. Off-hire and loss of goodwill adds to this figure and is perhaps the most difficult asset to replace. Engine room fires also represent a hazard for crew members working in that area and fire fighters.

2013.05.22 - Avoidance of Engine Room Fires Figure 1

[Read more…]