Palletised Reefer Cargo Gear Failure – Investigation Report

At approximately 1140 hours New Zealand Daylight Time (NZDT) on 15 October 2004, vehicles were being discharged from a reefer vessel. Two gangs from the stevedoring company were operating on board at the time. At about 1140 hours, a 0.5 tonne lifting frame was lifting an approximate 1.0 vehicle from No. 3 hold. The stevedore operating the winch observed the starboard runner wire was starting to unravel. The winch driver immediately lowered the port runner allowing the vehicle to drop onto the starboard deck, as the wire on the yardarm of the union purchase parted.

2013.04.22 - Palletised Reefer Cargo Gear Failure Figure 1

[Read more…]